22 Nov Progress Update 11/22/2010
Here are a few pictures from the first modular boxes being assembled in the factory. They may not look like much, but be sure to take notice of the little extras that go into making these homes superior: glued and fasten materials for stability, staggered studs for increased thermal performance, sealed joints for an airtight home.
|
Floor Framing – Glued and fastened for stability |
|
|
Exterior Wall – Staggered studs for decreased thermal bridging and increased insulation |
Back Wall being set |
|
|
Side Wall being set | All Joints sealed for airtight connections |