16 Dec Update for 12/15
Posted at 12:51h
in
Uncategorized
by admin
High’s in the upper 20’s couldn’t stop our progress! The crane and Superior Walls arrived on-site yesterday and after a little mechanical delay, they were rocking and rolling installing the foundation walls. These walls come with an R-13 value and are virtually waterproof, not to mention, pre-fabricated in a temperature controlled environment.
At the modular factory, the batch of boxes had their finishing touches done and are getting ready to ship out.